Product Delivery Schedules

LG-Motion Range

We work to realistic delivery schedules for all components and work hard to minimise the lead times for your components from Receipt Of Order (FRO)

UniSlide Dovetail Assemblies

Manual UniSlide 1 week FRO
Motorised Unislide 1-2 weeks FRO
UniSlide Multi Axis System 2-4 weeks FRO

BiSlide Dovetail Assemblies

BiSlide Manual 2-3 weeks FRO
BiSlide Motorised 2-3 weeks FRO
BiSlide Multi Axis System 4-5 weeks FRO

XSlide Dovetail Assemblies

X-Slide Manual 2-3 weeks FRO
X-Slide motorised 2-3 weeks FRO
X-Slide Multi Axis System 4-5 weeks FRO

LG Series

LGL – Linear Tables 4-6 weeks FRO (Ballscrew dependant)
LGR – Rotary Tables 2-3 weeks FRO
LGE – Elevator Tables 2-3 weeks FRO

Non-Standards

Custom Systems Application dependant
Control Cabinets 5-7 weeks

Schneeberger Range

Linear Bearing Catalogue – All parts shown in the catalogue in bold, should be available within 2-3 week in small quantities (i.e. up to 6 pcs).

Slides & Minislide – All parts shown in the catalogue in bold, should be available within 1 week in small quantities (i.e. up to 3 pcs).

Minirail – Standard rails and carriages available in 2-3 weeks for quantities up to 6 pcs

Ball & Roller Monorail – Rails and carriages 12 weeks. ‘Fast-track’ service for a 25% premium on standard list price. Or G0 grade at 3-4 weeks Emergency stock pricing

Please contact at the time as delivery schedules are currently fluctuating based on worldwide demand.

Heidenhain Range

Request Prior to Quoting & Confirming

Empire Magnetics Range

Request Prior to Quoting & Confirming

PMDi

2-4 weeks FRO

motion technology engineering company